JCP&L to Conduct Aerial Inspections

Thanks to our sponsors

Please be advised that Vista 1 plans to start performing Inspections on the JCP&L transmission lines beginning Monday August 17th. The Aerial Inspections in the JCP&L region typically require about 2 to 3 days for completion, depending of course on weather conditions, as well as other scheduling needs. The helicopter will be flying slowly (20-30 mph) along the lines, and may hover at any time for a closer inspection. The helicopter scheduled for these patrols is a black and silver Bell 206 w/ registration (tail) number N321AW. Please see attached photo for details.